Welding Data Capture


Introduction…
Murray & Roberts Power and Energy invite suitably qualified candidates to apply for the position of Welding Data Capture for Medupi reporting to the QA/QC Manager. The project entails the building of 6 x 780 MW Coal Fired Super Critical Boiler for the coal fired Medupi Power Station to be erected at the Medupi Site at Limpopo ,Lephalale, South Africa.

Minimum Requirements…
EXPERIENCE:
Suitable candidates must have the following work experience:

  • A minimum of 1 year working experience as a QC administrator.
  • A thorough understanding of the Quality Control Process is an advantage
  • A thorough knowledge and understanding of quality management system and proven office suite competence with Data Book supporting documents required to compile Work Packs.

QUALIFICATIONS:
Suitable candidates must possess the following minimum qualifications and skills:

  • Matric.
  • Knowledge of Weld Pac System
  • Computer Knowledge
  • Knowledge of Work Pack Compilation.

Job Specification…
THE SUCCESSFUL CANDIDATE’S RESPONSIBILITIES WILL INCLUDE, BUT NOT BE LIMITED TO:

PURPOSE OF THE JOB:
KEY PERFORMANCE INDICATORS:
KEY RESPONSIBILITIES:

  • Verify you are using the correct approved for manufacturing System drawing. Per unit.
  • Daily capture completed welds, NDT and Protocol information into the system – accurately according to the Approved manufacturing drawings.
  • Printing out of Weld Cards requested by Supervisors captured on the Request Weld Production Cards sheet for new or welds to be repaired.
  • All Daily Production welds must be completed into the system.
  • Ensure you have verify the information on the Weld Detailed Cards before capturing the production welds into the Weld Pac System.
  • No requesting of Weld Production Cards form the Weld Pac System is issued if the Daily Production information on the Weld Request is incorrectly documented by the Supervisor.
  • Verification for all Boiler Integral and HP Pipe work information must be 1st verified to the fabrication drawing and ITP by the Supervisor prior to making any requests for Weld Cards.
  • Information from the Weld Cards not just the Production must be inputted EG: Consumables. PWHT Chart No ETC – This must be completed Timeously,
  • Ensure all your Daily NDT Requests have been completed and handed back to NDE Coordinator.
  • Ensure all welding information is captured daily, verified against Weld Production sheet and Weld Maps – Check for errors and discrepancies before printing of Weld Comprehensives Reports.
  • Compiling of Work Packs, to insuring all supporting document and information from the Weld Comprehensive Report is as per Unit, System (KKS) and Drawings.
  • All Reports and Work Packs to be transmitted to Data Control Office daily.
  • Updating of the Transmittal register and Tracker daily
  • You are responsible for all information captured by yourself into the Weld Pac System, All information must be checked by yourself before printing out and for issue.
  • You are responsible for your specific unit but also you will be required at times to assist with helping others in your department on other Units as well as requested to working overtime when required.
  • Reporting daily to your line manager on issues or Road Blocks that prevent you from performing your daily duties as well as taking direct instructions from your direct line manager.
  • Safety is everyone’s responsibility, you will be held responsible to work safe every time.
  • Performance reviews will be carried out to measure you against your KPI,s and if found not inline, there will be action taken to performance manage you in the areas were you are not performing.
  • Your duties will include but not limited to the above.

COMPETENCY PROFILE:
ATTRIBUTES:

  • Team player
  • Be proactive
  • Have sound judgment
  • Logical, accurate and precise
  • Honest and open personality
  • Assertive
  • Good communication skills
  • Attention to detail
  • Interpersonal Skill
  • Methodical Approach to work
  • Good understanding of urgency
  • Your performance and delivery is important.
  • We are providing a service to site; we are the support system for the Welding Department.

How to Apply: Apply Here.